Water-fed pole SWMS
Records the work scope, hazards, controls, consultation, authorisation and supporting evidence for water-fed pole cleaning work. A live form your crew fills on their phones, not a Word template you retype on every site.
- The work scope
- Hazards
- Controls
- Consultation
- Authorisation
- Supporting evidence for water-fed pole cleaning work
This form ships inside 1 form pack. Pick the pack built for your setting and it arrives live in your Eaco workspace, branded to your business.
Rendered from the live form itself. Your logo replaces the placeholder the day you buy. On Eaco, branding is included, not a paid extra.
When you need this form
Reach-and-wash window cleaning looks low risk until the pole goes up near powerlines, on uneven ground or in wind. A water-fed pole SWMS covers the setup, exclusion zones, pole handling, hose management and water supply for facade and glazing rounds. Builders, facility managers and strata committees ask for it before a crew is allowed on site, and heights compliance decides most high-rise tenders.
Proof of use is where paper fails. A live SWMS captures the crew signing on at that address, photos of the exclusion zone and the pole reach against the actual building, and the supervisor closing it out. Tender assessors can see the method was applied on real jobs, not copied off a generic template.
What good looks like
- Pole reach and maximum working height stated against the building facade.
- Powerline clearance checked, exclusion zone set and photographed before setup.
- Ground conditions, pedestrian control and wind limits recorded for the day.
- Water supply, hose runs and slip controls noted at the entry.
- Crew sign-on captured, plus supervisor sign-off with site GPS.
Included in 1 form pack
Compare all packsEvery pack below carries the Water-fed pole SWMS plus the forms that win work in its setting. Buy the pack once and every form in it goes live, branded to you.
Water-fed pole SWMS, answered
Is this a PDF or Word template?
Neither. It is a live form: your crew opens it on their phones, ticks it through, attaches photos and signs on the glass. Every submission is timestamped, GPS-pinned and stored as proof.
Do I need a SWMS for water-fed pole window cleaning?
Most principal contractors and building managers require one before access is granted, and heights risk makes it standard practice. It records the method, the exclusion zones and the crew consultation for that site.
What should a water-fed pole SWMS include?
Scope of work, hazards such as powerlines, wind and slips, the controls applied, competency of the operators, worker consultation, authorisation and evidence photos. Sign-off closes it out once the round finishes.
Can I buy just this one form?
Forms ship in packs, from $99 one-time with GST included. Or get every form, this one and 276 more, plus Eaco AI on the $29 a month plan.

